What affects an estimate?
Structure size and material, condition, anchors, access, carrying distance, attached parts, loading constraints, and disposal needs can all affect the work.
Do I need to dismantle anything first?
No. Clear the yard and identify anything you want to keep. Do not climb or pull on a structure that is unstable.
Can parts be saved?
Tell the crew before work begins. Whether a part can remain intact depends on its condition, connections, and the route out of the yard.
What is usually not included?
Hazardous materials, unknown chemicals, and unrelated waste require separate review. Concrete footing or ground-restoration work should be confirmed in the estimate.
Still deciding?
Use the estimate checklist and call with the facts that shape the job.